Call us
+86 539 839 1999
Contact us
sales@camelply.com

Congratulations on the official operation of the third branch factory - CAMELPLY

Time: 2022-12-11 14:53:21

Author: Linyi Camel Plywood Co., Ltd

Click:

In 6 months, the third branch factory of Fortune BM Group was officially put into operation.

Congratulations!

In 6 months, the third branch factory of Fortune BM Group was officially put into operation.  The third branch factory has 6 hot press machines, mainly producing plug-in boards, with a daily production capacity of 300 cubic meters. At that time, the daily production capacity of the entire Fortune BM can reach 700 cubic meters. 

Through the integration of the supply chain, product prices and transportation costs will be reduced again. 


图片展示

Share Us

Sign up for our newsletter to stay up-to-date with our promotions, discounts, sales, and special offers

INFORMATION

PRODUCTS

TOP-SELLING PRODUCTS

No data

CONTACT US

Floor 9, Unit A,No.2 Building,Yihe Three Road,Linyi,ShangDong,China

0086-539-839-1999

sales@camelply.com

Copyright © Fortune BM 2022 All Rights Reserved.

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了